Rooftop solar installations rely on proper integration with the local distribution network. For property owners in Udaipur seeking to connect solar generation to the grid, understanding the net-metering process is a primary consideration. This mechanism allows excess power generated during the day to be fed back into the local utility infrastructure. Customers utilizing this service should be aware that the application process for net-metering is managed through the local DISCOM. The timeline for approval and final connection often depends on the specific administrative workload and processing capacity of the regional utility office. Engaging with the local utility early in the planning phase helps establish a clear understanding of the current application queue and required documentation. The suitability of this service is best for residential or commercial properties with stable roof space and a clear understanding of local grid interconnection requirements. Successful implementation requires adherence to both technical standards and the specific procedural guidelines set by the Rajasthan electricity board.
Get a quote from Sorza solar
Sorza solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Udaipur.
Rooftop solar in Udaipur, Rajasthan
A standard residential rooftop solar system in Udaipur sizes between 1 kW and 5 kW depending on monthly consumption. Most Udaipur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Sorza solar can quote your specific roof; use the Get Quote form above or call 093523 03384.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Udaipur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Udaipur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Sorza solar handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Sorza solar when you call (093523 03384) or fill the Get Quote form above.
What panels and inverters does Sorza solar typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Udaipur.
Location
Shop No.73, Jain colony, 100 ft Rd, Corner, University Rd, Keshav Nagar, Ayad, Pahada, Udaipur, Rajasthan 313001, India
View on Google Maps →Opening hours
| Sunday | 09:00 – 19:00 |
|---|---|
| Monday | 09:00 – 19:00 |
| Tuesday | 09:00 – 19:00 |
| Wednesday | 09:00 – 19:00 |
| Thursday | 09:00 – 19:00 |
| Friday | 09:00 – 19:00 |
| Saturday | 09:00 – 19:00 |