Sri Bhavani Electrical Solar Services

Rooftop solar installer in Warangal, Telangana. ★ 5.0 (92 Google reviews) Updated August 2026.

About

Individuals seeking to integrate solar power onto existing rooftops in the Warangal area often utilize this service provider. The expertise available covers the initial assessment phase of solar installations. Technicians conduct site surveys to evaluate the structural integrity and available surface area of the roof. During these visits, a detailed shading analysis is performed to map out areas of consistent sunlight exposure. This process helps determine the maximum realistic kilowatt capacity the roof can safely and effectively support for optimal energy generation.

Get a quote from Sri Bhavani Electrical Solar Services

Sri Bhavani Electrical Solar Services hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Warangal.

Rooftop solar in Warangal, Telangana

A standard residential rooftop solar system in Warangal sizes between 1 kW and 5 kW depending on monthly consumption. Most Warangal homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Sri Bhavani Electrical Solar Services can quote your specific roof; use the Get Quote form above or call 094409 90607.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Warangal?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Telangana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Warangal?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Telangana is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Sri Bhavani Electrical Solar Services handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Sri Bhavani Electrical Solar Services when you call (094409 90607) or fill the Get Quote form above.

What panels and inverters does Sri Bhavani Electrical Solar Services typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Warangal.

Location

Bandivari street, Kareemabad, Warangal, Telangana 506002, India

View on Google Maps →

Opening hours

SundayClosed
MondayClosed
TuesdayClosed
WednesdayClosed
ThursdayClosed
FridayClosed
SaturdayClosed
Chat with us