About
Visitors can expect an overview of the solar installation process and an assessment of their rooftop suitability during an initial consultation. The services provided are relevant for homeowners in Erode, Tamil Nadu, looking to integrate grid-tied solar power systems. When pursuing the PM-Surya Ghar subsidy, understanding the application timeline is a key consideration. The process typically requires coordination between the homeowner and the designated local authority. To streamline the initial paperwork, prospective customers should gather documentation such as proof of residence, property ownership records, and necessary identity proofs before visiting. It is advisable to confirm the current application window for the subsidy scheme, as eligibility and submission deadlines can change. Bringing these foundational documents to the consultation helps facilitate a more accurate assessment of the required subsidy paperwork and the next steps for system commissioning.
Get a quote from Stepup solar solutions
Stepup solar solutions hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Erode.
Rooftop solar in Erode, Tamil Nadu
A standard residential rooftop solar system in Erode sizes between 1 kW and 5 kW depending on monthly consumption. Most Erode homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Stepup solar solutions can quote your specific roof; use the Get Quote form above or call 089400 96714.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Erode?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Tamil Nadu residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Erode?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Tamil Nadu is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Stepup solar solutions handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Stepup solar solutions when you call (089400 96714) or fill the Get Quote form above.
What panels and inverters does Stepup solar solutions typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Erode.
Location
16, Deva street, Jaganathapuram Colony, Surampatty, Erode, Tamil Nadu 638009, India
View on Google Maps →Opening hours
| Sunday | 08:00 – 17:00 |
|---|---|
| Monday | 08:00 – 21:00 |
| Tuesday | 08:00 – 21:00 |
| Wednesday | 08:00 – 21:00 |
| Thursday | 08:00 – 21:00 |
| Friday | 08:00 – 21:00 |
| Saturday | 08:00 – 21:00 |
