About
A first visit to the facility will provide an overview of the solar installation process for residential properties in the Karad area. The location serves homeowners interested in integrating rooftop solar power systems into their existing dwellings. Understanding the subsidy process for the PM-Surya Ghar scheme is a key part of the initial consultation. Buyers should be aware that the application timing is often linked to the availability of the national portal and local utility requirements, so confirming the current application window is advisable. To streamline the subsidy paperwork, customers are advised to gather essential documentation before the appointment. This typically includes proof of residence, property ownership documents, and necessary identity proofs for all primary occupants. Having these documents prepared beforehand allows for a more efficient review of eligibility and the subsequent paperwork required for subsidy claims. The team can then guide the homeowner through the specific steps needed to submit the application package to the relevant authorities.
Get a quote from SunDay SOLAR POWER
SunDay SOLAR POWER hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Karad.
Rooftop solar in Karad, Maharashtra
A standard residential rooftop solar system in Karad sizes between 1 kW and 5 kW depending on monthly consumption. Most Karad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SunDay SOLAR POWER can quote your specific roof; use the Get Quote form above or call 088887 67755.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Karad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Karad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.
Does SunDay SOLAR POWER handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SunDay SOLAR POWER when you call (088887 67755) or fill the Get Quote form above.
What panels and inverters does SunDay SOLAR POWER typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Karad.
Location
90/4 "Silver-Oak" Opp. Janata Bazaar, Karad, Karad Khanapur Road, Budhwar peth, Karad, Maharashtra 415110, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 18:00 |
| Tuesday | 10:00 – 18:00 |
| Wednesday | 10:00 – 18:00 |
| Thursday | 10:00 – 18:00 |
| Friday | 10:00 – 18:00 |
| Saturday | 11:00 – 14:00 |
