About
Homeowners looking to install rooftop solar systems are typically guided to this facility for local support. When pursuing the PM-Surya Ghar subsidy, understanding the application timeline is important. The process generally requires initial registration through the designated national portal before physical installation can proceed. Customers should verify the current application window, as subsidy eligibility and submission deadlines are subject to change. To streamline the paperwork, bringing necessary documentation such as proof of residence, property ownership records, and valid identity proofs is advisable. Having these documents prepared in advance helps expedite the initial subsidy paperwork submission phase.
Get a quote from Sungo Power - Solar Distributor in Raipur
Sungo Power - Solar Distributor in Raipur hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Raipur.
Rooftop solar in Raipur, Chhattisgarh
A standard residential rooftop solar system in Raipur sizes between 1 kW and 5 kW depending on monthly consumption. Most Raipur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Sungo Power - Solar Distributor in Raipur can quote your specific roof; use the Get Quote form above or call 088899 30047.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Raipur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Chhattisgarh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Raipur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Chhattisgarh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Sungo Power - Solar Distributor in Raipur handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Sungo Power - Solar Distributor in Raipur when you call (088899 30047) or fill the Get Quote form above.
What panels and inverters does Sungo Power - Solar Distributor in Raipur typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Raipur.
Location
infront of MMR Hospital, C 103, Kamal Vihar, Sector 9, Sector 8 A, Raipur, Chhattisgarh 492015, India
View on Google Maps →Opening hours
| Sunday | 09:00 – 19:00 |
|---|---|
| Monday | 09:00 – 19:00 |
| Tuesday | 09:00 – 19:00 |
| Wednesday | 09:00 – 19:00 |
| Thursday | 09:00 – 19:00 |
| Friday | 09:00 – 19:00 |
| Saturday | 09:00 – 19:00 |
