About
Rooftop solar installations provide decentralized power generation for residential and commercial properties. Customers in the Hisar area of Haryana often utilize these systems to supplement grid electricity for daily household and business needs. The initial assessment process involves a detailed site survey to evaluate the structural integrity and available roof space. During this evaluation, technicians conduct a shading analysis to map out areas of consistent sunlight exposure throughout the day. This analysis is critical for determining the realistic kilowatt capacity the roof can safely and effectively support. Understanding the roof's potential output helps clients plan a system sized appropriately for their actual consumption patterns, ensuring optimal energy yield from the installed panels.
Get a quote from SunRays SOLAR
SunRays SOLAR hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Hisar.
Rooftop solar in Hisar, Haryana
A standard residential rooftop solar system in Hisar sizes between 1 kW and 5 kW depending on monthly consumption. Most Hisar homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SunRays SOLAR can quote your specific roof; use the Get Quote form above or call 099900 00029.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Hisar?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Hisar?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does SunRays SOLAR handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SunRays SOLAR when you call (099900 00029) or fill the Get Quote form above.
What panels and inverters does SunRays SOLAR typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Hisar.
Location
DSS 105, Ground Floor, near HDFC Bank, sector 15, Housing Board Colony, Sector 15A, Hisar, Haryana 125001, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 09:00 – 18:30 |
| Tuesday | 09:00 – 18:30 |
| Wednesday | 09:00 – 18:30 |
| Thursday | 09:00 – 18:30 |
| Friday | 09:00 – 18:30 |
| Saturday | 09:00 – 18:30 |
