Surya Ghar - Solar Installation Company in Akola

Rooftop solar installer in Akola, Maharashtra. ★ 5.0 (5 Google reviews) Updated August 2026.

About

Solar photovoltaic installations provide decentralized power generation for residential and commercial properties. The company serves the Akola region in Maharashtra, providing expertise in rooftop solar solutions. Customers seeking reliable integration of solar energy into existing structures may find the services relevant. Support for installed systems includes options for Annual Maintenance Contracts (AMC). These contracts outline the scope of ongoing system upkeep, which is necessary for sustained performance. Regarding panel maintenance, the company advises on appropriate panel cleaning schedules to ensure optimal energy capture throughout the year. Furthermore, the service scope encompasses post-installation support. This support structure is designed to assist property owners with the operational aspects of the solar array after the initial setup is complete.

Get a quote from Surya Ghar - Solar Installation Company in Akola

Surya Ghar - Solar Installation Company in Akola hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Akola.

Rooftop solar in Akola, Maharashtra

A standard residential rooftop solar system in Akola sizes between 1 kW and 5 kW depending on monthly consumption. Most Akola homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Surya Ghar - Solar Installation Company in Akola can quote your specific roof; use the Get Quote form above or call 088888 82027.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Akola?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Akola?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Surya Ghar - Solar Installation Company in Akola handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Surya Ghar - Solar Installation Company in Akola when you call (088888 82027) or fill the Get Quote form above.

What panels and inverters does Surya Ghar - Solar Installation Company in Akola typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Akola.

Location

Geetai Ratanlal Plot, Urdu School, 77, near Necklace Road, beside Thote Hospital, Ambedkar Nagar, Akola, Maharashtra 444001, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 20:00
Tuesday10:00 – 20:00
Wednesday10:00 – 20:00
Thursday10:00 – 20:00
Friday10:00 – 20:00
Saturday10:00 – 20:00
Chat with us