Suryansha Renewables - Solar Panel

Rooftop solar installer in Bhubaneswar, Odisha. ★ 5.0 (12 Google reviews) Updated August 2026.

About

Rooftop solar installations provide a method for generating decentralized electricity for residential use. The facility serves customers seeking to integrate solar power into existing homes within the Bhubaneswar area. When selecting inverter hardware, the team assesses system requirements to match the appropriate unit to the home's energy consumption profile. Regarding product longevity, the installation process includes provisions for equipment warranties. Furthermore, the service structure outlines a policy for on-site replacement should component failure occur, providing a defined procedure for maintenance after installation.

Get a quote from Suryansha Renewables - Solar Panel

Suryansha Renewables - Solar Panel hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Bhubaneswar.

Rooftop solar in Bhubaneswar, Odisha

A standard residential rooftop solar system in Bhubaneswar sizes between 1 kW and 5 kW depending on monthly consumption. Most Bhubaneswar homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Suryansha Renewables - Solar Panel can quote your specific roof; use the Get Quote form above or call 081178 62369.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Bhubaneswar?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Odisha residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Bhubaneswar?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Odisha is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Suryansha Renewables - Solar Panel handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Suryansha Renewables - Solar Panel when you call (081178 62369) or fill the Get Quote form above.

What panels and inverters does Suryansha Renewables - Solar Panel typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bhubaneswar.

Location

near PPL Colony, opposite of BPCL Petrol pump, Khandagiri, Bhubaneswar, Odisha 751030, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 21:00
Tuesday09:00 – 21:00
Wednesday09:00 – 21:00
Thursday09:00 – 21:00
Friday09:00 – 21:00
Saturday09:00 – 21:00
Chat with us