Suryoday Solar Pvt.Ltd

Rooftop solar installer in Aurangabad, Maharashtra. ★ 5.0 (29 Google reviews) Updated August 2026.

About

The solar energy landscape in Aurangabad, Maharashtra, is seeing increased adoption as consumers seek reliable, decentralized power solutions. Customers in this area are generally suited for systems requiring detailed site assessments to ensure optimal energy generation. Professionals at this facility conduct thorough site surveys that account for local roof structures and potential shading patterns. These analyses are critical for determining the realistic capacity a given rooftop can support. By evaluating roof orientation and shading throughout the day, the team can provide an accurate estimate of the achievable kilowatt capacity. This methodical approach helps buyers align their expectations with the physical limitations and potential of the installation site.

Get a quote from Suryoday Solar Pvt.Ltd

Suryoday Solar Pvt.Ltd hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Aurangabad.

Rooftop solar in Aurangabad, Maharashtra

A standard residential rooftop solar system in Aurangabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Aurangabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Suryoday Solar Pvt.Ltd can quote your specific roof; use the Get Quote form above or call directly.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Aurangabad?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Aurangabad?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Suryoday Solar Pvt.Ltd handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Suryoday Solar Pvt.Ltd when you call (see contact details) or fill the Get Quote form above.

What panels and inverters does Suryoday Solar Pvt.Ltd typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Aurangabad.

Location

Garkheda Parisar, Aurangabad, Maharashtra Opp.Jawaharnagar Police Station,Patel Complex Office No.6, V87X+F9J, Mehar Nagar, Garkheda, Chhatrapati Sambhajinagar, Maharashtra 431009, India

View on Google Maps →

Opening hours

Sunday09:00 – 21:00
Monday09:00 – 21:00
Tuesday09:30 – 21:00
Wednesday09:30 – 21:00
Thursday09:30 – 21:00
Friday09:30 – 21:00
Saturday09:30 – 21:00
Chat with us