SWASTIK Solar Energy Solutions

Rooftop solar installer in Nashik, Maharashtra. ★ 5.0 (10 Google reviews) Updated June 2026.

About

The climate in Nashik, Maharashtra, supports consistent solar irradiation, making rooftop photovoltaic systems a viable energy source for residential and commercial properties. Homeowners and property owners seeking to reduce reliance on grid electricity often find solar installations suitable for their energy needs. When pursuing the PM-Surya Ghar subsidy, the process requires careful attention to documentation and timing. Applicants should confirm the latest guidelines published by the relevant state nodal agency, as subsidy eligibility and required paperwork can change. Generally, having property ownership documents, a recent electricity bill, and the owner's identity proof are necessary prerequisites for initiating the application. It is advisable for prospective customers to gather these foundational documents before starting the online portal submission to ensure a smooth initial filing.

Get a quote from SWASTIK Solar Energy Solutions

SWASTIK Solar Energy Solutions hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Nashik.

Rooftop solar in Nashik, Maharashtra

A standard residential rooftop solar system in Nashik sizes between 1 kW and 5 kW depending on monthly consumption. Most Nashik homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SWASTIK Solar Energy Solutions can quote your specific roof; use the Get Quote form above or call directly.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Nashik?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Nashik?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.

Does SWASTIK Solar Energy Solutions handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SWASTIK Solar Energy Solutions when you call (see contact details) or fill the Get Quote form above.

What panels and inverters does SWASTIK Solar Energy Solutions typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Nashik.

Location

Plot No 34, Aditya Hall Road, opp. Raj Tower, Chetana nagar, Indira Nagar, Nashik, Maharashtra 422009, India

View on Google Maps →

Opening hours

Sunday08:00 – 20:00
Monday08:00 – 20:00
Tuesday08:00 – 20:00
Wednesday08:00 – 20:00
Thursday08:00 – 20:00
Friday08:00 – 20:00
Saturday08:00 – 20:00
Chat with us