Tata Power Solaroof CP(Edigital solar)

Rooftop solar installer in Sonipat, Haryana. ★ 4.9 (138 Google reviews) Updated August 2026.

About

The solar energy market in Sonipat reflects a growing interest in decentralized power generation for both residential and commercial properties. Homeowners and businesses looking to integrate rooftop solar systems often require guidance on local grid connectivity procedures. Understanding the specific requirements for DISCOM net-metering applications is a key consideration for system planning. Clients in the area typically benefit from local expertise regarding the utility interconnection process. The time frame for DISCOM approval and subsequent net-metering activation can vary, making preliminary consultation important for project timelines. Reviewing the local utility's current processing benchmarks helps set realistic expectations for system commissioning.

Get a quote from Tata Power Solaroof CP(Edigital solar)

Tata Power Solaroof CP(Edigital solar) hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Sonipat.

Rooftop solar in Sonipat, Haryana

A standard residential rooftop solar system in Sonipat sizes between 1 kW and 5 kW depending on monthly consumption. Most Sonipat homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Tata Power Solaroof CP(Edigital solar) can quote your specific roof; use the Get Quote form above or call directly.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Sonipat?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Sonipat?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Tata Power Solaroof CP(Edigital solar) handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Tata Power Solaroof CP(Edigital solar) when you call (see contact details) or fill the Get Quote form above.

What panels and inverters does Tata Power Solaroof CP(Edigital solar) typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Sonipat.

Location

Ground floor, Street no 8, Gohana Rd, Sector 21, Indian Colony Extension, Sonipat, Haryana 131001, India

View on Google Maps →

Opening hours

Sunday09:00 – 17:00
Monday09:00 – 19:00
Tuesday09:00 – 19:00
Wednesday09:00 – 19:00
Thursday09:00 – 19:00
Friday09:00 – 19:00
Saturday09:00 – 19:00
Chat with us