About
Homeowners interested in installing rooftop solar systems often visit this facility for guidance on government subsidy programs. Customers seeking to utilize the PM-Surya Ghar subsidy scheme should confirm the current application window, as eligibility and submission timelines can change. To facilitate the subsidy process, applicants typically need to gather several key documents before starting the paperwork. These required materials often include proof of residence, ownership documents for the property, and valid identification for all primary occupants. It is advisable for prospective buyers to verify the specific documentation checklist provided by the official government portal, as the dealer can assist in organizing the necessary paperwork for submission.
Get a quote from Tata Power Solaroof - Kehansri Technologies And Services Pvt Ltd
Submit your name + phone to reveal Tata Power Solaroof - Kehansri Technologies And Services Pvt Ltd's contact and notify them. No spam, no obligation.
Rooftop solar in Hyderabad, Telangana
A standard residential rooftop solar system in Hyderabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Hyderabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Tata Power Solaroof - Kehansri Technologies And Services Pvt Ltd can quote your specific roof; use the Get Quote form above or call 099854 08602.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Hyderabad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Telangana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Hyderabad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Telangana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Tata Power Solaroof - Kehansri Technologies And Services Pvt Ltd handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Tata Power Solaroof - Kehansri Technologies And Services Pvt Ltd when you call (099854 08602) or fill the Get Quote form above.
What panels and inverters does Tata Power Solaroof - Kehansri Technologies And Services Pvt Ltd typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Hyderabad.
Location
2-55, Street Number 19, opposite Ingenium School, Sri Shyam Nagar, Telecom Nagar, Gachibowli, Hyderabad, Telangana 500032, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 18:00 |
| Tuesday | 10:00 – 18:00 |
| Wednesday | 10:00 – 18:00 |
| Thursday | 10:00 – 18:00 |
| Friday | 10:00 – 18:00 |
| Saturday | 11:00 – 18:00 |
