TRUZON SOLAR (Pratham Energies)

Rooftop solar installer in Solapur, Maharashtra. ★ 4.8 (49 Google reviews) Updated August 2026.

About

When considering solar installations in the Solapur area, understanding the roof's physical characteristics is a necessary first step. The process involves a detailed site survey to assess the available mounting area and potential shading patterns throughout the day. This analysis helps determine the realistic capacity the roof structure can safely support for solar generation. Homeowners or commercial entities in the region who require an accurate assessment of their roof's potential are well served by this service. Technicians evaluate factors such as roof pitch and orientation, providing an estimate of the achievable kilowatt capacity based on site-specific conditions.

Get a quote from TRUZON SOLAR (Pratham Energies)

TRUZON SOLAR (Pratham Energies) hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Solapur.

Rooftop solar in Solapur, Maharashtra

A standard residential rooftop solar system in Solapur sizes between 1 kW and 5 kW depending on monthly consumption. Most Solapur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. TRUZON SOLAR (Pratham Energies) can quote your specific roof; use the Get Quote form above or call 093726 47446.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Solapur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Solapur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.

Does TRUZON SOLAR (Pratham Energies) handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with TRUZON SOLAR (Pratham Energies) when you call (093726 47446) or fill the Get Quote form above.

What panels and inverters does TRUZON SOLAR (Pratham Energies) typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Solapur.

Location

Baldawa house, 125 B, Bhavani Peth, Solapur, Maharashtra 413002, India

View on Google Maps →

Opening hours

Sunday10:30 – 17:30
MondayClosed
Tuesday09:00 – 17:30
Wednesday10:30 – 17:30
Thursday10:30 – 17:30
Friday10:30 – 17:30
Saturday10:30 – 17:30
Chat with us