Udaipur Green Energy Solutions - TATA Power Solar's Authorised Channel Partner

Rooftop solar installer in Udaipur, Rajasthan. ★ 4.9 (142 Google reviews) Updated August 2026.

About

Visitors to this facility can expect guidance through the initial stages of residential solar system planning. The expertise available here is suitable for homeowners in the Udaipur area seeking to integrate rooftop solar power into their existing electrical infrastructure. When determining the appropriate inverter, consultation is available to match the system's capacity with the household's specific energy consumption profile. Regarding system longevity, the dealer provides information concerning the manufacturer's warranty structure, which covers various components of the installation. Furthermore, the process for addressing equipment failure is outlined, detailing the established on-site replacement procedures that apply to covered hardware. This focus on post-installation support helps customers understand the maintenance framework accompanying the initial setup. The consultation process generally involves assessing the roof structure and the required power output to ensure the selected components meet local energy needs effectively.

Get a quote from Udaipur Green Energy Solutions - TATA Power Solar's Authorised Channel Partner

Udaipur Green Energy Solutions - TATA Power Solar's Authorised Channel Partner hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Udaipur.

Rooftop solar in Udaipur, Rajasthan

A standard residential rooftop solar system in Udaipur sizes between 1 kW and 5 kW depending on monthly consumption. Most Udaipur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Udaipur Green Energy Solutions - TATA Power Solar's Authorised Channel Partner can quote your specific roof; use the Get Quote form above or call 079761 48980.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Udaipur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Udaipur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Udaipur Green Energy Solutions - TATA Power Solar's Authorised Channel Partner handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Udaipur Green Energy Solutions - TATA Power Solar's Authorised Channel Partner when you call (079761 48980) or fill the Get Quote form above.

What panels and inverters does Udaipur Green Energy Solutions - TATA Power Solar's Authorised Channel Partner typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Udaipur.

Location

100 Feet Rd, near Mahila Ahinsha Prasikshan Kendra, Meera Nagar, Shobhagpura, Udaipur, Rajasthan 313001, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:30 – 19:00
Tuesday09:30 – 19:00
Wednesday09:30 – 19:00
Thursday09:30 – 19:00
Friday09:30 – 19:00
Saturday09:30 – 19:00
Chat with us