About
Visitors can expect an initial consultation regarding solar energy system requirements at this facility. The service provider is situated in Solapur, Maharashtra, and generally serves residential and small commercial clients looking to integrate rooftop solar power. For customers considering long-term ownership, the company offers Annual Maintenance Contracts (AMC) which detail scheduled servicing plans. Regarding panel upkeep, the standard recommendation provided involves cleaning the solar panels every three to six months, depending on local dust accumulation rates. Post-installation support typically covers system performance monitoring and troubleshooting assistance. A concrete point for prospective buyers is to request a detailed breakdown of the AMC scope, specifically noting which components are covered under routine inspection versus those requiring separate parts replacement.
Get a quote from VEDANT ENTERPRISES TATA POWER SOLAR
VEDANT ENTERPRISES TATA POWER SOLAR hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Solapur.
Rooftop solar in Solapur, Maharashtra
A standard residential rooftop solar system in Solapur sizes between 1 kW and 5 kW depending on monthly consumption. Most Solapur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. VEDANT ENTERPRISES TATA POWER SOLAR can quote your specific roof; use the Get Quote form above or call 093704 07525.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Solapur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Solapur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.
Does VEDANT ENTERPRISES TATA POWER SOLAR handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with VEDANT ENTERPRISES TATA POWER SOLAR when you call (093704 07525) or fill the Get Quote form above.
What panels and inverters does VEDANT ENTERPRISES TATA POWER SOLAR typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Solapur.
Location
shop no 1 davdatta apartment near kadadi hospital budhle galli, balivas, Mangalwar Peth, Solapur, Maharashtra 413002, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 22:00 – 20:30 |
| Tuesday | 22:00 – 20:30 |
| Wednesday | 22:00 – 20:30 |
| Thursday | 22:00 – 20:30 |
| Friday | 22:00 – 20:30 |
| Saturday | 22:00 – 20:30 |
