Solar Installers in Visakhapatnam

11 verified rooftop solar installers in Visakhapatnam, Andhra Pradesh. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated June 2026.

Future Solutions ( Solar & Aqua Solutions)

★ 5.0 (23)

Shop No. 9-1, 63/2, Rama Talkies Rd, opposite Swarna Bharathi Stadium, AU North Campus, Resapuvanipalem, Asilmetta, Visakhapatnam, Andhra Pradesh 530013, India

PURESOLAR ENERGY SOLUTIONS

★ 5.0 (6)

SF 02, VENUS CASTLE, 13-2-3, MAHARANIPETA, Visakhapatnam, Andhra Pradesh 530002, India

Sky solar

★ 4.8 (10)

Sai sathya nilayam, ground floor, 50-9-16, Seethammapeta Main Rd, Seetamma Peta, Dwaraka Nagar, Visakhapatnam, Andhra Pradesh 530016, India

Sunrise Solar Solutions

★ 4.4 (14)

MIG 1A/22/1, MVP Cir, Sector 9, MVP Colony, Visakhapatnam, Andhra Pradesh 530017, India

EcoMitra Solar Pvt. Ltd.

★ 4.4 (7)

D, 1-8/2, Police Quarters Rd, beside Donne Biryani House, Vishalakshi Nagar, Visakhapatnam, Andhra Pradesh 530043, India

Tata Power Solar

★ 3.8 (6)

P8C4+2MG, Jail Rd, Rednam Garden Near Pydah Degree College, Ram Nagar, Visakhapatnam, Andhra Pradesh 530002, India

Frequently asked questions

Which is the best rooftop solar installer in Visakhapatnam?

"Best" depends on your roof size and budget — but a workable shortlist is the top 3 installers above by Google rating and review count, then ask each for a written quote covering panel make (Tier-1 only), inverter brand, structure type, BoS, and warranty terms. Verified phone numbers above let you call directly; reputable installers will do a free site survey in Visakhapatnam before pricing.

How much does rooftop solar cost in Visakhapatnam?

A 3kW residential system in Visakhapatnam typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Andhra Pradesh tariffs: 4-6 years.

Does my electricity board support net-metering?

Yes — all Andhra Pradesh DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).

How long does installation take?

Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Visakhapatnam, mostly waiting on DISCOM net-meter approval.

Can I get a loan or EMI for rooftop solar in Visakhapatnam?

Yes. Most public-sector banks (SBI, Canara, BoB) and several NBFCs offer solar loans covering 80-90% of system cost at 8-11% interest, 5-7 year tenure. Many installers in Visakhapatnam also have tie-ups with financing partners and can process the loan alongside the PM-Surya Ghar subsidy paperwork. Ask the installer to quote both cash and EMI prices.

Related

Chat with us