WAAREE Solar OV Enterprises

Rooftop solar installer in Jodhpur, Rajasthan. ★ 4.8 (24 Google reviews) Updated August 2026.

About

Customers seeking comprehensive rooftop solar installations in the Jodhpur area often visit this facility. The technical staff assists clients with selecting appropriate inverter models based on specific household energy requirements. When considering system longevity, the center provides information regarding manufacturer warranties applicable to the installed components. Furthermore, the service structure includes details about the on-site replacement policy for critical equipment, outlining the process for addressing hardware failures after installation. Clients can discuss the scope of coverage provided by the warranty, ensuring they understand the terms related to performance guarantees and replacement procedures. This focus on post-installation support helps buyers build a complete understanding of the system's long-term operational reliability.

Get a quote from WAAREE Solar OV Enterprises

WAAREE Solar OV Enterprises hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Jodhpur.

Rooftop solar in Jodhpur, Rajasthan

A standard residential rooftop solar system in Jodhpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Jodhpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. WAAREE Solar OV Enterprises can quote your specific roof; use the Get Quote form above or call 070142 65869.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Jodhpur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Jodhpur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does WAAREE Solar OV Enterprises handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with WAAREE Solar OV Enterprises when you call (070142 65869) or fill the Get Quote form above.

What panels and inverters does WAAREE Solar OV Enterprises typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Jodhpur.

Location

PLOT NO. 17, Sector - D, Vivek Vihar Yojana, Jodhpur, Sangariya, Rajasthan 342005, India

View on Google Maps →

Opening hours

SundayClosed
Monday08:00 – 18:00
Tuesday08:00 – 18:00
Wednesday08:00 – 18:00
Thursday08:00 – 18:00
Friday08:00 – 18:00
Saturday08:00 – 18:00
Chat with us