Waaree Solar Power Centre - EPC SOLAR SPACE PVT LTD

Rooftop solar installer in Mumbai, Maharashtra. ★ 3.4 (5 Google reviews) Updated June 2026.

About

The coastal climate and high population density of Mumbai present specific considerations for solar installations, particularly concerning rooftop space utilization and local grid integration. Properties in the metropolitan area often require solutions that maximize energy generation within limited roof footprints, making residential and small commercial consumers the primary fit for solar adoption. Navigating the local distribution company's net-metering process requires attention to procedural timelines. Applicants should anticipate that the utility's review and approval cycle for net-metering applications can vary significantly. A practical step for prospective buyers is to confirm the specific documentation requirements directly with the local DISCOM office before submitting the initial application package. Furthermore, understanding the local grid capacity assessment is crucial. While the process is managed by the utility, early engagement with the local electrical authority regarding the feasibility study for the intended system size can help mitigate potential delays during the interconnection phase.

Get a quote from Waaree Solar Power Centre - EPC SOLAR SPACE PVT LTD

Submit your name + phone to reveal Waaree Solar Power Centre - EPC SOLAR SPACE PVT LTD's contact and notify them. No spam, no obligation.

Rooftop solar in Mumbai, Maharashtra

A standard residential rooftop solar system in Mumbai sizes between 1 kW and 5 kW depending on monthly consumption. Most Mumbai homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Waaree Solar Power Centre - EPC SOLAR SPACE PVT LTD can quote your specific roof; use the Get Quote form above or call 090825 34578.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Mumbai?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Mumbai?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Waaree Solar Power Centre - EPC SOLAR SPACE PVT LTD handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Waaree Solar Power Centre - EPC SOLAR SPACE PVT LTD when you call (090825 34578) or fill the Get Quote form above.

What panels and inverters does Waaree Solar Power Centre - EPC SOLAR SPACE PVT LTD typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Mumbai.

Location

3065, Bhandup industrial estate, Pannalal Compound, near, Lal Bahadur Shastri Marg, Bhandup, Sadan wadi, Bhandup West, Mumbai, Maharashtra 400078, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:30 – 18:30
Tuesday09:30 – 18:30
Wednesday09:30 – 18:30
Thursday09:00 – 18:30
Friday09:30 – 18:30
Saturday09:30 – 18:30
Chat with us