BM Solar Solutions
No 5A, Sriram Square Extension, 5A, NGO A Colony, Palayamkottai, Tirunelveli, Tamil Nadu 627007, India
14 verified rooftop solar installers in Tirunelveli, Tamil Nadu. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.
No 5A, Sriram Square Extension, 5A, NGO A Colony, Palayamkottai, Tirunelveli, Tamil Nadu 627007, India
Palayamkottai, Tirunelveli, Tamil Nadu 627002, India
Canara Bank, D15, 20th Cross St, opposite street, Maharaja Nagar, Tirunelveli, Tamil Nadu 627011, India
161B/1, S.N. High Road, Junction, Tenkasi - Tirunelveli Rd, Thirunagar, Tirunelveli Town, Tirunelveli, Tamil Nadu 627001, India
QP23+FFG, Madurai Rd, Thachanallur, Tirunelveli, Tamil Nadu 627358, India
Raheem Plaza, 125/4, 7th St, Perumalpuram, Vasantha Nager, Tirunelveli, Tamil Nadu 627007, India
33B, Trivandrum Rd, near Government Engineering College, Teacher's Colony, Teachers Colony, Tirunelveli, Perumalpuram, Tamil Nadu 627007, India
No.39, Byepass Road East, Barani Nagar, Vannarpettai, Tirunelveli, Tamil Nadu 627003, India
PPH9+4MW, TVM main Road, opp. Dinamalar Office, Kailash Nagar, Kokkirakulam, Tirunelveli, Tamil Nadu 627003, India
29-A, TKC St, Thiyagaraja Nagar, Tirunelveli, Tamil Nadu 627011, India
MGXF+W68, Perumal Sannathi St, TIRUNELVELI JUNCTION, Veeravanallur, Tamil Nadu 627001, India
62a, S Bazaar, Palayamkottai, Tirunelveli, Tamil Nadu 627002, India
100/1A, Nethaji Rd, opposite Santhai, Engineers Colony, Melapalayam, Tirunelveli, Tamil Nadu 627005, India
No. 7, Pudhukulam Dhachenalur, Tirunelveli, Tamil Nadu 627358, India
A 3kW residential system in Tirunelveli typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Tamil Nadu tariffs: 4-6 years.
Yes — all Tamil Nadu DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).
Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Tirunelveli, mostly waiting on DISCOM net-meter approval.