About
Customers seeking established solar energy solutions often visit this facility. When selecting photovoltaic panels, attention should be paid to the manufacturer's standing in the industry. It is advisable to confirm that the panels originate from Tier-1 manufacturers, as this designation relates to the company's operational scale and reliability. Furthermore, reviewing the warranty structure is a key part of the selection process. Specifically, understanding the terms of the performance warranty, such as a 25-year guarantee, provides insight into the expected longevity of the system's output. Buyers should verify the scope of these warranties to ensure they cover degradation rates and performance guarantees over the specified period.
Get a quote from ADITYA SOLAR POWER
ADITYA SOLAR POWER hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Sagar.
Rooftop solar in Sagar, Madhya Pradesh
A standard residential rooftop solar system in Sagar sizes between 1 kW and 5 kW depending on monthly consumption. Most Sagar homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. ADITYA SOLAR POWER can quote your specific roof; use the Get Quote form above or call 093404 41615.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Sagar?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Madhya Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Sagar?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Madhya Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does ADITYA SOLAR POWER handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with ADITYA SOLAR POWER when you call (093404 41615) or fill the Get Quote form above.
What panels and inverters does ADITYA SOLAR POWER typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Sagar.
Location
Shop No 4, Nema Building, Somnath Puram, Tilli, Sagar, Madhya Pradesh 470002, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 11:00 – 19:00 |
| Tuesday | 11:00 – 19:00 |
| Wednesday | 11:00 – 19:00 |
| Thursday | 11:00 – 19:00 |
| Friday | 11:00 – 19:00 |
| Saturday | 11:00 – 19:00 |
