Solar Installers in Sagar

15 verified rooftop solar installers in Sagar, Madhya Pradesh. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated July 2026.

ADITYA SOLAR POWER

★ 5.0 (33)

Shop No 4, Nema Building, Somnath Puram, Tilli, Sagar, Madhya Pradesh 470002, India

R B Sun Solar Energy

★ 5.0 (13)

Shri Nagar Colony, Sagar, Makroniya, Madhya Pradesh 470004, India

Sun Wave Enterprises Solar

★ 5.0 (10)

Pant Nagar Ward, Sanjay Dr, near century Marriage garden with Rose residency, Kakaganj, Sagar, Madhya Pradesh 470001, India

MICRON SOLAR ENERGY

★ 5.0 (7)

Dwarika Vihar Chouraha, 11, Tili Rd, in front of SatSang Bhavan, Dwarika Garden, Sagar, Madhya Pradesh 470001, India

SUN URJA SOLAR SOLUTIONS

★ 5.0 (5)

near lal school gopalganj, Gopal Ganj, Sagar, Madhya Pradesh 470001, India

Shri Arihant solar

★ 5.0 (4)

Makroniya, Sagar, Madhya Pradesh 470004, India

SUN ENERGY SOLAR SYSTEM

★ 4.8 (8)

Vishwabharti school, road, Bhagwan Ganj, Sagar, Madhya Pradesh 470002, India

Anant Solar Solutions

★ 4.7 (38)

Tili Rd, near Sehnai Garden, Gopal Ganj, Sagar, Madhya Pradesh 470001, India

Frequently asked questions

Which is the best rooftop solar installer in Sagar?

"Best" depends on your roof size and budget — but a workable shortlist is the top 3 installers above by Google rating and review count, then ask each for a written quote covering panel make (Tier-1 only), inverter brand, structure type, BoS, and warranty terms. Verified phone numbers above let you call directly; reputable installers will do a free site survey in Sagar before pricing.

How much does rooftop solar cost in Sagar?

A 3kW residential system in Sagar typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Madhya Pradesh tariffs: 4-6 years.

Does my electricity board support net-metering?

Yes — all Madhya Pradesh DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).

How long does installation take?

Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Sagar, mostly waiting on DISCOM net-meter approval.

Can I get a loan or EMI for rooftop solar in Sagar?

Yes. Most public-sector banks (SBI, Canara, BoB) and several NBFCs offer solar loans covering 80-90% of system cost at 8-11% interest, 5-7 year tenure. Many installers in Sagar also have tie-ups with financing partners and can process the loan alongside the PM-Surya Ghar subsidy paperwork. Ask the installer to quote both cash and EMI prices.

Related

Chat with us