About
A first visit to the facility will provide an overview of the available rooftop solar solutions for residential properties. Individuals or homeowners in the Kanpur area seeking to integrate solar energy into their dwellings can consult with the team regarding system sizing and feasibility assessments. The process for availing the PM-Surya Ghar subsidy requires careful attention to timing and documentation. Applicants should confirm the current application window, as subsidy eligibility and submission portals are subject to periodic updates. When preparing for the subsidy application, it is advisable to gather all necessary identification and property documentation beforehand. Typically, this includes proof of residency, ownership documents for the rooftop, and valid identification for all primary occupants. Consulting with the local team early in the process can help clarify which specific documents are required for the current subsidy cycle, minimizing potential delays during the submission phase. Understanding the sequence of paperwork—from initial site assessment to final subsidy claim—is key to a smooth installation process.
Get a quote from AJ SOLAR SOLUTION
AJ SOLAR SOLUTION hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Kanpur.
Rooftop solar in Kanpur, Uttar Pradesh
A standard residential rooftop solar system in Kanpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Kanpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. AJ SOLAR SOLUTION can quote your specific roof; use the Get Quote form above or call directly.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Kanpur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Kanpur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does AJ SOLAR SOLUTION handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with AJ SOLAR SOLUTION when you call (see contact details) or fill the Get Quote form above.
What panels and inverters does AJ SOLAR SOLUTION typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kanpur.
Location
534/41, BN A, Deoki Nagar, Yashoda Nagar, Kanpur, Uttar Pradesh 208011, India
View on Google Maps →Opening hours
| Sunday | 10:00 – 19:00 |
|---|---|
| Monday | 10:00 – 19:00 |
| Tuesday | 10:00 – 19:00 |
| Wednesday | 10:00 – 19:00 |
| Thursday | 10:00 – 19:00 |
| Friday | 10:00 – 19:00 |
| Saturday | 10:00 – 19:00 |
