Bliss Solar Power (P) Limited

Rooftop solar installer in Jammu, Jammu and Kashmir. ★ 5.0 (9 Google reviews) Updated August 2026.

About

The solar energy landscape in Jammu is characterized by varied architectural styles and diverse rooftop conditions. Customers in this region often benefit from assessments that account for local structural variations when planning solar installations. A thorough site survey is necessary to accurately map the available roof space and assess potential shading from surrounding structures or topography. Determining the realistic kilowatt capacity requires detailed shading analysis, which identifies areas of consistent sunlight exposure throughout the day. This process helps installers recommend a system size that maximizes energy yield based on the actual roof profile. The service is best suited for property owners seeking a data-driven approach to integrating solar power into existing residential or commercial structures.

Get a quote from Bliss Solar Power (P) Limited

Bliss Solar Power (P) Limited hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Jammu.

Rooftop solar in Jammu, Jammu and Kashmir

A standard residential rooftop solar system in Jammu sizes between 1 kW and 5 kW depending on monthly consumption. Most Jammu homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Bliss Solar Power (P) Limited can quote your specific roof; use the Get Quote form above or call 070066 02386.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Jammu?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Jammu and Kashmir residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Jammu?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Jammu and Kashmir is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Bliss Solar Power (P) Limited handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Bliss Solar Power (P) Limited when you call (070066 02386) or fill the Get Quote form above.

What panels and inverters does Bliss Solar Power (P) Limited typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Jammu.

Location

C/o, Qubicle Coworking, Plot #334, opp. PNB Bank, Sector - 1A, Trikuta Nagar, Jammu, 180004

View on Google Maps →

Opening hours

SundayClosed
Monday09:30 – 18:00
Tuesday09:30 – 18:00
Wednesday09:30 – 18:00
Thursday09:30 – 18:00
Friday09:30 – 18:00
Saturday09:30 – 18:00
Chat with us