Ecoepicsolar Private Limited
backside of bismi market, Bandhu Rakh, Jammu-Kunjwani Bypass Rd, Gangayal, Jammu, 180010
10 verified rooftop solar installers in Jammu, Jammu and Kashmir. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated July 2026.
backside of bismi market, Bandhu Rakh, Jammu-Kunjwani Bypass Rd, Gangayal, Jammu, 180010
Ground Floor, nearby Ashok Leyland Showroom, Channi Himat, Jammu, 180011
Ward No. 68, Door no-20210, Lane no-4, near canal road, Lower, Greater Kailash, Jammu, 180011
92, B.C Rd, nearby Mahindra Showroom, Ambphalla, Rehari Colony, Jammu, 180005
C/o, Qubicle Coworking, Plot #334, opp. PNB Bank, Sector - 1A, Trikuta Nagar, Jammu, 180004
Rani Talab, near by Police Post Digiana, Digiana, Sanjay Nagar, Jammu, 180010
Sector No.3, Ward No. 56, near St Paul's Convent High School, Gangayal, Jammu, 180010
N.H ,Above E.D.Bank,, Nai Basti Rd, Shastri Nagar, Jammu, 180003
Satyam Road, opposite Royalnest chandan faltu shiv mandir, Trikuta Nagar, Jammu, Jammu and Kashmir 180020, Trikuta Nagar, Jammu, 180012
A/D, park, 119, Green Belt Rd, near Sethi Embroidery Lane, Gandhi Nagar, Jammu, 180004
"Best" depends on your roof size and budget — but a workable shortlist is the top 3 installers above by Google rating and review count, then ask each for a written quote covering panel make (Tier-1 only), inverter brand, structure type, BoS, and warranty terms. Verified phone numbers above let you call directly; reputable installers will do a free site survey in Jammu before pricing.
A 3kW residential system in Jammu typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Jammu and Kashmir tariffs: 4-6 years.
Yes — all Jammu and Kashmir DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).
Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Jammu, mostly waiting on DISCOM net-meter approval.
Yes. Most public-sector banks (SBI, Canara, BoB) and several NBFCs offer solar loans covering 80-90% of system cost at 8-11% interest, 5-7 year tenure. Many installers in Jammu also have tie-ups with financing partners and can process the loan alongside the PM-Surya Ghar subsidy paperwork. Ask the installer to quote both cash and EMI prices.