Rasraj Electricals - Solar Power Solutions

Rooftop solar installer in Jammu, Jammu and Kashmir. ★ 3.4 (5 Google reviews) Updated August 2026.

About

Solar power solutions for residential and commercial properties in the Jammu area are provided through this establishment. Customers seeking reliable integration of solar energy systems can find resources here. When selecting the appropriate inverter, the facility works with various models to match the specific load requirements of the property. The system includes manufacturer warranties covering the equipment, alongside established policies for on-site replacement should any component fail under warranty terms. This structure aims to provide clarity regarding long-term operational support for the installed solar array. Individuals or businesses looking to transition to solar power in the region can consult with the team regarding system sizing and component longevity.

Get a quote from Rasraj Electricals - Solar Power Solutions

Rasraj Electricals - Solar Power Solutions hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Jammu.

Rooftop solar in Jammu, Jammu and Kashmir

A standard residential rooftop solar system in Jammu sizes between 1 kW and 5 kW depending on monthly consumption. Most Jammu homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Rasraj Electricals - Solar Power Solutions can quote your specific roof; use the Get Quote form above or call 091860 98140.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Jammu?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Jammu and Kashmir residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Jammu?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Jammu and Kashmir is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Rasraj Electricals - Solar Power Solutions handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Rasraj Electricals - Solar Power Solutions when you call (091860 98140) or fill the Get Quote form above.

What panels and inverters does Rasraj Electricals - Solar Power Solutions typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Jammu.

Location

A/D, park, 119, Green Belt Rd, near Sethi Embroidery Lane, Gandhi Nagar, Jammu, 180004

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 18:00
Tuesday09:00 – 18:00
Wednesday09:00 – 18:00
Thursday09:00 – 18:00
Friday09:00 – 18:00
Saturday09:00 – 18:00
Chat with us