Electrosol Solar India Pvt Ltd

Rooftop solar installer in Moradabad, Uttar Pradesh. ★ 4.0 (4 Google reviews) Updated August 2026.

About

Individuals seeking professional solar installations for residential or commercial rooftops often visit this facility. The location assists customers in selecting appropriate inverter models based on system requirements. Technicians on staff provide guidance regarding inverter compatibility with various solar array sizes. Furthermore, the service structure includes provisions for product warranties and details concerning on-site replacement procedures should a component fail under warranty terms. Customers can inquire about the specific coverage parameters associated with the installed equipment.

Get a quote from Electrosol Solar India Pvt Ltd

Electrosol Solar India Pvt Ltd hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Moradabad.

Rooftop solar in Moradabad, Uttar Pradesh

A standard residential rooftop solar system in Moradabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Moradabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Electrosol Solar India Pvt Ltd can quote your specific roof; use the Get Quote form above or call 082720 31008.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Moradabad?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Moradabad?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Electrosol Solar India Pvt Ltd handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Electrosol Solar India Pvt Ltd when you call (082720 31008) or fill the Get Quote form above.

What panels and inverters does Electrosol Solar India Pvt Ltd typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Moradabad.

Location

Poonam Vihar, Khushhalpur, Moradabad, Uttar Pradesh 244001, India

View on Google Maps →

Opening hours

SundayClosed
MondayClosed
TuesdayClosed
Wednesday00:00 – 00:00
ThursdayClosed
FridayClosed
SaturdayClosed
Chat with us