About
The climate in Rohtak, Haryana, presents consistent solar irradiation suitable for rooftop photovoltaic installations. Homeowners and small commercial entities in the area often seek energy independence due to fluctuating grid reliability. Customers typically benefit from systems sized to offset daytime consumption, particularly for residential needs and small-scale businesses that operate during daylight hours. When considering grid integration, understanding the local distribution company's net-metering process is important. The speed at which the local utility processes net-metering applications can vary, making proactive documentation crucial for project timelines. It is advisable for prospective buyers to confirm the current documentation requirements directly with the local DISCOM office before finalizing system sizing. Furthermore, verifying the specific interconnection agreement details early in the planning phase helps mitigate potential delays associated with grid connectivity approvals.
Get a quote from Hindustan solar and battery
Hindustan solar and battery hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Rohtak.
Rooftop solar in Rohtak, Haryana
A standard residential rooftop solar system in Rohtak sizes between 1 kW and 5 kW depending on monthly consumption. Most Rohtak homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Hindustan solar and battery can quote your specific roof; use the Get Quote form above or call 086073 45674.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Rohtak?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Rohtak?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Hindustan solar and battery handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Hindustan solar and battery when you call (086073 45674) or fill the Get Quote form above.
What panels and inverters does Hindustan solar and battery typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Rohtak.
Location
Jind Bye Pass, Bus Stop, Outer City Rd, Gopal Colony, Rohtak, Haryana 124001, India
View on Google Maps →Opening hours
| Sunday | 09:00 – 20:00 |
|---|---|
| Monday | 09:00 – 20:00 |
| Tuesday | 09:00 – 20:00 |
| Wednesday | 09:00 – 20:00 |
| Thursday | 09:00 – 20:00 |
| Friday | 09:00 – 20:00 |
| Saturday | 09:00 – 20:00 |
