Kalpana Solar Traders

Rooftop solar installer in Kanpur, Uttar Pradesh. ★ 5.0 (13 Google reviews) Updated June 2026.

About

The climate in Kanpur, Uttar Pradesh, presents consistent solar irradiation suitable for rooftop photovoltaic installations across both residential and small commercial properties. Homeowners and businesses looking to integrate solar power into their existing infrastructure often find this region favorable for decentralized energy generation. When considering grid connectivity, understanding the local distribution company (DISCOM) net-metering process is a key consideration for system planning. Applicants should anticipate that the timeline for DISCOM approval and final connection can vary based on the utility's current workload and procedural backlog. It is advisable for prospective buyers to initiate the net-metering application well in advance of the physical installation date to account for potential administrative delays. Furthermore, verifying the specific interconnection guidelines mandated by the local utility office before finalizing system sizing helps prevent rework after initial approvals are granted.

Get a quote from Kalpana Solar Traders

Submit your name + phone to reveal Kalpana Solar Traders's contact and notify them. No spam, no obligation.

Rooftop solar in Kanpur, Uttar Pradesh

A standard residential rooftop solar system in Kanpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Kanpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Kalpana Solar Traders can quote your specific roof; use the Get Quote form above or call 087369 92133.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Kanpur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Kanpur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Kalpana Solar Traders handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Kalpana Solar Traders when you call (087369 92133) or fill the Get Quote form above.

What panels and inverters does Kalpana Solar Traders typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kanpur.

Location

Metro Pillar No.111, Police Chowki, 31, Hamirpur Rd, opp. Basant Vihar, Naubasta, Kanpur, Uttar Pradesh 208021, India

View on Google Maps →

Opening hours

Sunday09:00 – 21:00
Monday09:00 – 21:00
Tuesday09:00 – 21:00
Wednesday09:00 – 21:00
Thursday09:00 – 21:00
Friday09:00 – 21:00
Saturday09:00 – 21:00
Chat with us