About
The solar energy market in Agra reflects a growing interest in decentralized power generation solutions. Homeowners and small commercial entities seeking to mitigate reliance on grid electricity often find rooftop solar installations a practical fit. Considering the local electricity tariffs, the return on investment is frequently calculated based on the rate of savings achieved against current consumption patterns. Analysis of local energy costs suggests that the payback period for a residential system can be significantly influenced by the current tariff structure. By offsetting a substantial portion of daytime usage, property owners can establish a predictable timeline for achieving energy cost neutrality. This approach allows for a clearer assessment of the system's long-term financial viability within the regional grid context.
Get a quote from Lodhi Solar - Solar Systems, Panels, Services
Submit your name + phone to reveal Lodhi Solar - Solar Systems, Panels, Services's contact and notify them. No spam, no obligation.
Rooftop solar in Agra, Uttar Pradesh
A standard residential rooftop solar system in Agra sizes between 1 kW and 5 kW depending on monthly consumption. Most Agra homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Lodhi Solar - Solar Systems, Panels, Services can quote your specific roof; use the Get Quote form above or call 087550 52897.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Agra?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Agra?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Lodhi Solar - Solar Systems, Panels, Services handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Lodhi Solar - Solar Systems, Panels, Services when you call (087550 52897) or fill the Get Quote form above.
What panels and inverters does Lodhi Solar - Solar Systems, Panels, Services typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Agra.
Location
BT4 201 , ADA HEIGHTS, Taj Nagri Phase 2, Tajganj, Agra, Uttar Pradesh 282004, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | Closed |
| Tuesday | Closed |
| Wednesday | Closed |
| Thursday | Closed |
| Friday | Closed |
| Saturday | Closed |
