About
Visitors can expect guidance regarding the initial steps for integrating rooftop solar systems into their property. The location serves residential customers interested in adopting solar energy solutions for their homes. When addressing the PM-Surya Ghar subsidy program, understanding the correct application timing is important, as the process is tied to specific governmental cycles. To streamline the subsidy paperwork, customers should prepare a set of foundational documents before the initial consultation. These typically include proof of residency, property ownership documentation, and necessary identity proofs for all occupants. It is recommended that prospective buyers confirm the latest required documentation list directly with the portal or the local authority, as requirements can change. The process generally involves submitting the application through the designated national portal, followed by site assessment and final subsidy disbursement.
Get a quote from SunFusion Energy India (Solar Solutions)
Submit your name + phone to reveal SunFusion Energy India (Solar Solutions)'s contact and notify them. No spam, no obligation.
Rooftop solar in Agra, Uttar Pradesh
A standard residential rooftop solar system in Agra sizes between 1 kW and 5 kW depending on monthly consumption. Most Agra homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SunFusion Energy India (Solar Solutions) can quote your specific roof; use the Get Quote form above or call 080771 17564.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Agra?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Agra?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does SunFusion Energy India (Solar Solutions) handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SunFusion Energy India (Solar Solutions) when you call (080771 17564) or fill the Get Quote form above.
What panels and inverters does SunFusion Energy India (Solar Solutions) typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Agra.
Location
26/84, Ahir para, Raja Mandi, Gokul Pura, Agra, Uttar Pradesh 282002, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 00:00 – 00:00 |
| Tuesday | Closed |
| Wednesday | Closed |
| Thursday | Closed |
| Friday | Closed |
| Saturday | Closed |
