Marudhar Solar

Rooftop solar installer in Bikaner, Rajasthan. ★ 5.0 (909 Google reviews) Updated August 2026.

About

Individuals seeking to integrate rooftop solar power into residential or commercial properties often visit this facility. The expertise available here covers the complete scope of solar photovoltaic system installations for various building types. When considering grid connectivity, understanding the local utility's requirements is a key step. Customers should be aware that the process for obtaining DISCOM net-metering approvals can vary in terms of processing time. It is advisable for prospective buyers to confirm the current turnaround time for net-metering applications directly with the local distribution company, as timelines are subject to utility operational schedules. This local knowledge helps ensure that the system design aligns correctly with the grid connection parameters.

Get a quote from Marudhar Solar

Marudhar Solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Bikaner.

Rooftop solar in Bikaner, Rajasthan

A standard residential rooftop solar system in Bikaner sizes between 1 kW and 5 kW depending on monthly consumption. Most Bikaner homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Marudhar Solar can quote your specific roof; use the Get Quote form above or call 094689 42062.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Bikaner?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Bikaner?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Marudhar Solar handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Marudhar Solar when you call (094689 42062) or fill the Get Quote form above.

What panels and inverters does Marudhar Solar typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bikaner.

Location

Bhutto ka chauraha, Old Gajner Rd, Mehron Ka Bas, Bikaner, Rajasthan 334001, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 19:00
Tuesday10:00 – 19:00
Wednesday10:00 – 19:00
Thursday10:00 – 19:00
Friday10:00 – 19:00
Saturday10:00 – 05:00
Chat with us