SHRI SHYAM SOLAR VENTURE PVT LTD

Rooftop solar installer in Bikaner, Rajasthan. ★ 5.0 (68 Google reviews) Updated August 2026.

About

When considering rooftop solar installation in the Bikaner area, understanding the subsidy process is a key step in planning the project. Individuals or property owners looking to integrate solar power into their homes should note the specific requirements for the PM-Surya Ghar subsidy. To manage the subsidy paperwork, it is advisable to confirm the current application window, as timing can affect eligibility. Customers should prepare necessary documentation in advance, which typically includes proof of residence, electricity connection details, and identity verification documents. Reviewing these requirements beforehand helps streamline the submission process with the relevant authorities.

Get a quote from SHRI SHYAM SOLAR VENTURE PVT LTD

SHRI SHYAM SOLAR VENTURE PVT LTD hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Bikaner.

Rooftop solar in Bikaner, Rajasthan

A standard residential rooftop solar system in Bikaner sizes between 1 kW and 5 kW depending on monthly consumption. Most Bikaner homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SHRI SHYAM SOLAR VENTURE PVT LTD can quote your specific roof; use the Get Quote form above or call 077376 35271.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Bikaner?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Bikaner?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does SHRI SHYAM SOLAR VENTURE PVT LTD handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SHRI SHYAM SOLAR VENTURE PVT LTD when you call (077376 35271) or fill the Get Quote form above.

What panels and inverters does SHRI SHYAM SOLAR VENTURE PVT LTD typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bikaner.

Location

22 MAJOR KRISHAN MARG, RAM MANDIR ROAD, behind CHOPRA KATLA, Panchmukh, Rani Bazar, Bikaner, Rajasthan 334001, India

View on Google Maps →

Opening hours

Sunday11:00 – 05:00
Monday09:00 – 20:00
Tuesday09:00 – 20:00
Wednesday09:00 – 20:00
Thursday09:00 – 20:00
Friday09:00 – 20:00
Saturday09:00 – 20:00
Chat with us