Matri Shree Green Solar

Rooftop solar installer in Varanasi, Uttar Pradesh. ★ 4.7 (62 Google reviews) Updated June 2026.

About

The climate in Varanasi, characterized by seasonal heat and atmospheric dust, necessitates solar installations that account for regular maintenance to maintain efficiency. Homeowners and small commercial entities in the area often benefit from solar power due to consistent daytime energy needs. When considering solar integration, the scope of post-installation support is a key factor for long-term performance. It is advisable for buyers to inquire specifically about the structure of the Annual Maintenance Contract (AMC) offered, as this dictates the level of ongoing technical oversight. Furthermore, understanding the recommended panel cleaning frequency

Get a quote from Matri Shree Green Solar

Matri Shree Green Solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Varanasi.

Rooftop solar in Varanasi, Uttar Pradesh

A standard residential rooftop solar system in Varanasi sizes between 1 kW and 5 kW depending on monthly consumption. Most Varanasi homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Matri Shree Green Solar can quote your specific roof; use the Get Quote form above or call 0542 250 3835.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Varanasi?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Varanasi?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Matri Shree Green Solar handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Matri Shree Green Solar when you call (0542 250 3835) or fill the Get Quote form above.

What panels and inverters does Matri Shree Green Solar typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Varanasi.

Location

Flat No-11, First Floor, Block No-F1 Opposite Hotel Taj, Mint House, Patel Nagar, Nadesar, Chaukaghat, Varanasi, Uttar Pradesh 221002, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 19:30
Tuesday10:00 – 19:30
Wednesday10:00 – 19:30
Thursday10:00 – 19:30
Friday10:00 – 19:30
Saturday10:00 – 19:30
Chat with us