Mehak Solar Power

Rooftop solar installer in Rohtak, Haryana. ★ 4.9 (91 Google reviews) Updated August 2026.

About

Rooftop solar installations provide an alternative source of electricity generation for residential and commercial properties. Customers in the Rohtak area often seek solar solutions to mitigate the impact of fluctuating grid electricity costs. The return on investment for a solar system is influenced by the local electricity tariff structure, which determines the rate of savings realized through self-consumption. For property owners considering solar power, understanding the local tariff rates is key to estimating the payback period. A detailed assessment of the average monthly consumption against the current electricity rate helps in projecting the financial viability of the system. Furthermore, the system's capacity relative to the household's peak load dictates the potential for energy offset, directly affecting the timeline for achieving cost neutrality.

Get a quote from Mehak Solar Power

Mehak Solar Power hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Rohtak.

Rooftop solar in Rohtak, Haryana

A standard residential rooftop solar system in Rohtak sizes between 1 kW and 5 kW depending on monthly consumption. Most Rohtak homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Mehak Solar Power can quote your specific roof; use the Get Quote form above or call 086858 47621.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Rohtak?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Rohtak?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Mehak Solar Power handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Mehak Solar Power when you call (086858 47621) or fill the Get Quote form above.

What panels and inverters does Mehak Solar Power typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Rohtak.

Location

House no. 42/15 Opp. Khadi Bhandar, Udmipura, Civil Rd, Arya Nagar, Rohtak, Haryana 124001, India

View on Google Maps →

Opening hours

Sunday10:00 – 17:00
Monday09:00 – 18:30
Tuesday09:00 – 18:30
Wednesday09:00 – 18:30
Thursday09:00 – 18:30
Friday09:00 – 18:30
Saturday09:00 – 18:30
Chat with us