About
The climate in Bhubaneswar, characterized by distinct wet and dry seasons, makes rooftop solar installations a viable option for managing residential electricity consumption. Homeowners in the area who are looking to reduce reliance on grid power and benefit from government incentives should familiarize themselves with the PM-Surya Ghar subsidy program. Understanding the application timeline is crucial, as the process requires adherence to specific state and central guidelines. To initiate the subsidy claim, applicants generally need to gather several key documents. These typically include proof of residency, ownership documentation for the property, and the necessary electrical connection details. It is advisable for prospective buyers to confirm the latest required documentation list directly with the local distribution company or the designated subsidy portal before beginning the application. For residents considering solar power, the initial assessment of roof suitability and energy needs is the most practical first step. Consulting with local experts early in the planning phase helps ensure that the system size aligns correctly with the household's consumption profile and the available subsidy structure.
Get a quote from NINA SOLAR
NINA SOLAR hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Bhubaneswar.
Rooftop solar in Bhubaneswar, Odisha
A standard residential rooftop solar system in Bhubaneswar sizes between 1 kW and 5 kW depending on monthly consumption. Most Bhubaneswar homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. NINA SOLAR can quote your specific roof; use the Get Quote form above or call directly.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Bhubaneswar?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Odisha residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Bhubaneswar?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Odisha is 3.5 – 5 years; the panels carry a 25-year warranty.
Does NINA SOLAR handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with NINA SOLAR when you call (see contact details) or fill the Get Quote form above.
What panels and inverters does NINA SOLAR typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bhubaneswar.
Location
Aishwarya Palace), 401, Plot No-A/143, Saheed Nagar, Bhubaneswar, Odisha 751007, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 17:30 |
| Tuesday | 10:00 – 17:30 |
| Wednesday | 10:00 – 17:30 |
| Thursday | 10:00 – 17:30 |
| Friday | 10:00 – 17:30 |
| Saturday | 10:00 – 17:30 |
