Nirmala Solar Power Generation Private Limited

Rooftop solar installer in Varanasi, Uttar Pradesh. ★ 4.1 (82 Google reviews) Updated June 2026.

About

The climate in Varanasi, characterized by distinct seasonal variations and high solar irradiance potential, makes rooftop solar installations a viable energy solution for both residential and commercial properties. Customers in this area often benefit from solar power due to the consistent daytime energy demand across various sectors. When assessing a potential installation site, a thorough site survey is necessary to evaluate the roof's structural integrity and orientation. Furthermore, a detailed shading analysis is critical, as nearby structures or foliage can significantly reduce the energy yield of the array. Based on these assessments, the system's maximum achievable capacity, measured in kilowatts (kW), is determined to ensure the design aligns with the available, unshaded roof area. For optimal performance, the final system size recommendation must account for the specific roof dimensions and the prevailing shading patterns observed during the year.

Get a quote from Nirmala Solar Power Generation Private Limited

Submit your name + phone to reveal Nirmala Solar Power Generation Private Limited's contact and notify them. No spam, no obligation.

Rooftop solar in Varanasi, Uttar Pradesh

A standard residential rooftop solar system in Varanasi sizes between 1 kW and 5 kW depending on monthly consumption. Most Varanasi homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Nirmala Solar Power Generation Private Limited can quote your specific roof; use the Get Quote form above or call 093194 83455.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Varanasi?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Varanasi?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Nirmala Solar Power Generation Private Limited handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Nirmala Solar Power Generation Private Limited when you call (093194 83455) or fill the Get Quote form above.

What panels and inverters does Nirmala Solar Power Generation Private Limited typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Varanasi.

Location

N1/66R-15K, Samne Ghat, Nagwa Lanka, Varanasi, Uttar Pradesh 221005, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 18:00
Tuesday09:00 – 18:00
Wednesday09:00 – 18:00
Thursday09:00 – 18:00
Friday09:00 – 18:00
Saturday09:00 – 18:00
Chat with us