About
The climate and local power infrastructure in Cuttack necessitate reliable backup power solutions for residential and small commercial properties. Customers in this area often require systems capable of handling fluctuating grid stability and varying load demands. For optimal system design, careful consideration of the inverter capacity is necessary, as sizing must account for peak usage rather than average consumption. When selecting equipment, understanding the warranty structure is important; reputable installers provide clear documentation regarding component coverage, distinguishing between panel warranties and inverter warranties. Furthermore, inquiries regarding the on-site replacement policy should clarify the process timeline for defective units. A practical consideration for buyers is confirming the manufacturer's commitment to local service support. Given the area's typical usage patterns, selecting an inverter model with proven efficiency in tropical humidity levels is a recommended starting point for system planning.
Get a quote from Odishasolar
Odishasolar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Cuttack.
Rooftop solar in Cuttack, Odisha
A standard residential rooftop solar system in Cuttack sizes between 1 kW and 5 kW depending on monthly consumption. Most Cuttack homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Odishasolar can quote your specific roof; use the Get Quote form above or call 098201 35995.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Cuttack?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Odisha residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Cuttack?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Odisha is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Odishasolar handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Odishasolar when you call (098201 35995) or fill the Get Quote form above.
What panels and inverters does Odishasolar typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Cuttack.
Location
shop no-1,C/O-A. Roy ,CESU Colony,A D Nagar,Badambadi,753012, Orissa State Electricity Board Colony, Cuttack, Odisha 753012, India
View on Google Maps →Opening hours
| Sunday | 08:00 – 20:30 |
|---|---|
| Monday | 08:00 – 20:30 |
| Tuesday | 08:00 – 20:30 |
| Wednesday | 08:00 – 20:30 |
| Thursday | 08:00 – 20:30 |
| Friday | 08:00 – 20:30 |
| Saturday | 08:00 – 20:30 |
