About
The solar energy sector in Bhubaneswar is experiencing growth, with increasing residential and commercial interest in rooftop installations. Customers seeking reliable long-term energy solutions often find value in comprehensive after-sales arrangements. The service provider offers annual maintenance contracts designed to cover the operational longevity of the installed system. Regarding system upkeep, the company advises on appropriate panel cleaning schedules to maintain peak efficiency. Furthermore, the scope of support extends beyond initial commissioning, providing post-installation assistance to help owners manage the system's performance over time.
Get a quote from POWERUP 2.0 - A Solar Solution Provider Company
POWERUP 2.0 - A Solar Solution Provider Company hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Bhubaneswar.
Rooftop solar in Bhubaneswar, Odisha
A standard residential rooftop solar system in Bhubaneswar sizes between 1 kW and 5 kW depending on monthly consumption. Most Bhubaneswar homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. POWERUP 2.0 - A Solar Solution Provider Company can quote your specific roof; use the Get Quote form above or call 093375 12355.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Bhubaneswar?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Odisha residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Bhubaneswar?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Odisha is 3.5 – 5 years; the panels carry a 25-year warranty.
Does POWERUP 2.0 - A Solar Solution Provider Company handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with POWERUP 2.0 - A Solar Solution Provider Company when you call (093375 12355) or fill the Get Quote form above.
What panels and inverters does POWERUP 2.0 - A Solar Solution Provider Company typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bhubaneswar.
Location
Plot No. EB-91, Badagada Rd, Badagada Brit Colony, Colony, Old Town, Bhubaneswar, Odisha 751018, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 09:30 – 21:30 |
| Tuesday | 09:30 – 21:30 |
| Wednesday | 09:30 – 21:30 |
| Thursday | 09:30 – 21:30 |
| Friday | 09:30 – 21:30 |
| Saturday | 09:30 – 21:30 |
