About
Rooftop solar installations provide decentralized power generation for residential properties. Customers in the Bengaluru area seeking to utilize the PM-Surya Ghar subsidy program should understand the application process timing is critical for eligibility. The subsidy application is typically initiated through the designated national portal after the system design and technical feasibility have been confirmed by the installer. To streamline the subsidy claim, applicants should prepare a set of necessary documents in advance. These generally include proof of residence, ownership documents for the property, and valid identification for all occupants. It is advisable for prospective buyers to confirm the exact documentation checklist with the local service provider before beginning the formal application submission. The process involves coordination between the homeowner, the local distribution company, and the subsidy portal. Understanding the sequence of paperwork—from initial application to final inspection—helps ensure a smoother transition toward system commissioning and subsidy disbursement.
Get a quote from Samson Solar Energy. Sales & Services
Submit your name + phone to reveal Samson Solar Energy. Sales & Services's contact and notify them. No spam, no obligation.
Rooftop solar in Bengaluru, Karnataka
A standard residential rooftop solar system in Bengaluru sizes between 1 kW and 5 kW depending on monthly consumption. Most Bengaluru homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Samson Solar Energy. Sales & Services can quote your specific roof; use the Get Quote form above or call 099161 67190.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Bengaluru?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Karnataka residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Bengaluru?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Karnataka is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Samson Solar Energy. Sales & Services handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Samson Solar Energy. Sales & Services when you call (099161 67190) or fill the Get Quote form above.
What panels and inverters does Samson Solar Energy. Sales & Services typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bengaluru.
Location
38th Cross, 22nd Main Rd, 4th T Block East, 5th Block, Jayanagar, Bengaluru, Karnataka 560041, India
View on Google Maps →Opening hours
| Sunday | 09:00 – 20:00 |
|---|---|
| Monday | 09:00 – 20:00 |
| Tuesday | 09:00 – 20:00 |
| Wednesday | 09:00 – 20:00 |
| Thursday | 09:00 – 20:00 |
| Friday | 09:00 – 20:00 |
| Saturday | 09:00 – 20:00 |
