Shriram Solar System

Rooftop solar installer in Gorakhpur, Uttar Pradesh. ★ 4.8 (46 Google reviews) Updated August 2026.

About

Customers seeking established solar energy solutions often visit this facility. The selection of photovoltaic panels available at this location includes products from several Tier-1 manufacturers. These brands are recognized within the industry for their panel efficiency and durability. When reviewing panel options, buyers should verify the warranty terms provided, paying particular attention to the length of the product warranty, as some manufacturers offer coverage periods extending up to 25 years. Additionally, it is advisable to confirm the performance warranty details alongside the product warranty to understand the long-term performance guarantees.

Get a quote from Shriram Solar System

Shriram Solar System hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Gorakhpur.

Rooftop solar in Gorakhpur, Uttar Pradesh

A standard residential rooftop solar system in Gorakhpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Gorakhpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Shriram Solar System can quote your specific roof; use the Get Quote form above or call 091400 72549.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Gorakhpur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Gorakhpur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Shriram Solar System handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Shriram Solar System when you call (091400 72549) or fill the Get Quote form above.

What panels and inverters does Shriram Solar System typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Gorakhpur.

Location

Deoria Bypass, Tiraha, Deoria Rd, near Nayara Petrol Pump, Rapti Nagar Phase-4, Gorakhpur, Uttar Pradesh 273010, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 19:00
Tuesday10:00 – 19:00
Wednesday10:00 – 19:00
Thursday10:00 – 19:00
Friday10:00 – 19:00
Saturday10:00 – 19:00
Chat with us