About
Individuals seeking reliable rooftop solar solutions in the Jaipur area often visit this facility. The expertise available here supports residential and commercial properties looking to integrate solar power into their existing infrastructure. For customers concerned with the return on investment, the payback period is heavily influenced by the local electricity tariff structure. Given the prevailing rates in Rajasthan, generating a significant portion of household or business consumption directly offsets high monthly utility expenditures. This direct reduction in operational costs accelerates the timeline for achieving a positive return. A thorough assessment of the site's consumption patterns against current tariffs allows for a more accurate projection of the system's payback period. Considering the consistent energy needs of the region, solar installation can provide a predictable hedge against future increases in grid electricity costs, establishing a measurable long-term return on the initial investment.
Get a quote from Solar91 Cleantech Limited
Solar91 Cleantech Limited hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Jaipur.
Rooftop solar in Jaipur, Rajasthan
A standard residential rooftop solar system in Jaipur sizes between 1 kW and 5 kW depending on monthly consumption. Most Jaipur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Solar91 Cleantech Limited can quote your specific roof; use the Get Quote form above or call 072208 10810.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Jaipur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Jaipur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Solar91 Cleantech Limited handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Solar91 Cleantech Limited when you call (072208 10810) or fill the Get Quote form above.
What panels and inverters does Solar91 Cleantech Limited typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Jaipur.
Location
D-802, Sector 5, Malviya Nagar, Jaipur, Rajasthan 302017, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 18:30 |
| Tuesday | 10:00 – 18:30 |
| Wednesday | 10:00 – 18:30 |
| Thursday | 10:00 – 18:30 |
| Friday | 10:00 – 18:30 |
| Saturday | 10:00 – 18:30 |
