About
Visitors can expect an assessment of solar energy integration tailored to the specific structural requirements of their property. The expertise available at this facility is suitable for residential and small commercial properties within the Bengaluru area. When evaluating the return on investment, the calculation must account for the current local electricity tariffs in Karnataka. A detailed analysis of the average consumption patterns against the prevailing grid rates helps establish a more accurate payback timeline. For homeowners whose primary energy use occurs during peak daytime hours, maximizing rooftop solar capacity is generally recommended to offset the highest-cost electricity usage. Furthermore, understanding the local net metering policies is a practical step before finalizing system sizing. This consideration ensures that the projected savings accurately reflect the credits available from the local utility provider. A thorough review of the site's shading profile is also a necessary preliminary step to ensure optimal energy yield from the installed system.
Get a quote from SolarOhms Renewable Energy
Submit your name + phone to reveal SolarOhms Renewable Energy's contact and notify them. No spam, no obligation.
Rooftop solar in Bengaluru, Karnataka
A standard residential rooftop solar system in Bengaluru sizes between 1 kW and 5 kW depending on monthly consumption. Most Bengaluru homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SolarOhms Renewable Energy can quote your specific roof; use the Get Quote form above or call 098446 13486.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Bengaluru?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Karnataka residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Bengaluru?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Karnataka is 3.5 – 5 years; the panels carry a 25-year warranty.
Does SolarOhms Renewable Energy handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SolarOhms Renewable Energy when you call (098446 13486) or fill the Get Quote form above.
What panels and inverters does SolarOhms Renewable Energy typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bengaluru.
Location
Vrindavanam, 4th Cross Road, #38, Oil Mill Rd, Peace Layout, Lingarajapuram, Bengaluru, Karnataka 560084, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 18:00 |
| Tuesday | 10:00 – 18:00 |
| Wednesday | 10:00 – 18:00 |
| Thursday | 10:00 – 18:00 |
| Friday | 10:00 – 18:00 |
| Saturday | 10:00 – 18:00 |
