About
Visitors can expect an overview of the process when consulting with the local team regarding solar installations. Individuals or properties in the Kozhikode area who are considering rooftop solar power generation are generally served by this facility. The process for connecting to the local distribution company (DISCOM) involves specific steps related to net-metering applications. Understanding the local utility's current processing timelines for these applications is a practical consideration for any prospective customer. Successfully navigating the net-metering process requires attention to the specific documentation required by the regional utility provider. While the technical aspects of the solar system design are managed by the installer, the timeline for grid connectivity is dictated by the DISCOM's review cycle. It is advisable for potential buyers to inquire directly about the current average turnaround time for net-metering approvals in the Kozhikode region. This proactive step helps set realistic expectations regarding the commissioning date of the system.
Get a quote from Startsun solar
Startsun solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Kozhikode.
Rooftop solar in Kozhikode, Kerala
A standard residential rooftop solar system in Kozhikode sizes between 1 kW and 5 kW depending on monthly consumption. Most Kozhikode homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Startsun solar can quote your specific roof; use the Get Quote form above or call 081295 02726.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Kozhikode?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Kerala residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Kozhikode?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Kerala is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Startsun solar handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Startsun solar when you call (081295 02726) or fill the Get Quote form above.
What panels and inverters does Startsun solar typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kozhikode.
Location
60/401B,Ground Floor, viva plaza, Ram Mohan Rd, behind francis alukkas, Chindhavalappu, Palayam, Kozhikode, Kerala 673004, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 09:30 – 18:30 |
| Tuesday | 09:30 – 18:30 |
| Wednesday | 09:30 – 18:30 |
| Thursday | 09:30 – 18:30 |
| Friday | 09:30 – 18:30 |
| Saturday | 09:30 – 18:30 |
