About
The solar energy market in Kanpur is seeing increased adoption as local electricity tariffs influence residential and commercial energy planning. Homeowners and small businesses seeking to mitigate rising utility costs often find rooftop solar installations a viable option. Considering the local electricity rates, the return on investment for a system is heavily influenced by the consumption profile of the property. Buyers typically achieve a more favorable payback period when the system is sized to offset the highest usage periods, such as peak daytime commercial operations or consistent residential loads. Accurate assessment of the local tariff structure is key to determining the realistic payback timeline.
Get a quote from Sunroof Solar Solutions | Subsidy Solar in Kanpur
Submit your name + phone to reveal Sunroof Solar Solutions | Subsidy Solar in Kanpur's contact and notify them. No spam, no obligation.
Rooftop solar in Kanpur, Uttar Pradesh
A standard residential rooftop solar system in Kanpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Kanpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Sunroof Solar Solutions | Subsidy Solar in Kanpur can quote your specific roof; use the Get Quote form above or call 083189 83904.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Kanpur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Kanpur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Sunroof Solar Solutions | Subsidy Solar in Kanpur handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Sunroof Solar Solutions | Subsidy Solar in Kanpur when you call (083189 83904) or fill the Get Quote form above.
What panels and inverters does Sunroof Solar Solutions | Subsidy Solar in Kanpur typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kanpur.
Location
N Block, near petrol pump, Keshavpuram, Rawatpur Gaon, Kanpur, Uttar Pradesh 208019, India
View on Google Maps →Opening hours
| Sunday | 10:00 – 20:00 |
|---|---|
| Monday | 10:00 – 20:00 |
| Tuesday | 10:00 – 20:00 |
| Wednesday | 10:00 – 20:00 |
| Thursday | 10:00 – 20:00 |
| Friday | 10:00 – 20:00 |
| Saturday | 10:00 – 20:00 |
