About
Visitors can expect an assessment of their rooftop space and a discussion regarding system integration during an initial consultation. The services provided are generally suited for property owners in Bengaluru seeking to incorporate solar energy into existing structures. Regarding long-term maintenance, the company offers Annual Maintenance Contracts (AMC) which cover scheduled servicing of the installed equipment. It is practical for buyers to inquire about the recommended panel cleaning schedule, as dust accumulation in the region can impact energy yield if not addressed regularly. Furthermore, the profile indicates that post-installation support is a component of their service offering. When evaluating a solar installation, potential customers should confirm the specific scope of the warranty provided for both the hardware and the workmanship.
Get a quote from Superior Solar Systems
Submit your name + phone to reveal Superior Solar Systems's contact and notify them. No spam, no obligation.
Rooftop solar in Bengaluru, Karnataka
A standard residential rooftop solar system in Bengaluru sizes between 1 kW and 5 kW depending on monthly consumption. Most Bengaluru homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Superior Solar Systems can quote your specific roof; use the Get Quote form above or call 093413 33843.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Bengaluru?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Karnataka residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Bengaluru?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Karnataka is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Superior Solar Systems handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Superior Solar Systems when you call (093413 33843) or fill the Get Quote form above.
What panels and inverters does Superior Solar Systems typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bengaluru.
Location
60/1, 80 Feet Ring Road, Circle, Jnanabharathi Post, Mariyappana Palya, Jnana Ganga Nagar, Bengaluru, Karnataka 560056, India
View on Google Maps →Opening hours
| Sunday | 07:00 – 22:00 |
|---|---|
| Monday | 07:00 – 22:00 |
| Tuesday | 07:00 – 22:00 |
| Wednesday | 07:00 – 22:00 |
| Thursday | 07:00 – 22:00 |
| Friday | 07:00 – 22:00 |
| Saturday | 07:00 – 22:00 |
