BIKANER SOLAR

Rooftop solar installer in Bikaner, Rajasthan. ★ 4.9 (28 Google reviews) Updated August 2026.

About

Rooftop solar installations provide an option for residential electricity generation. Customers in the Bikaner area seeking solar solutions can find assistance with the necessary subsidy application process. The PM-Surya Ghar scheme requires careful coordination between system installation and subsidy paperwork. It is advisable for prospective buyers to confirm the current application window, as timing for subsidy eligibility can change. When preparing for the subsidy application, having documentation ready streamlines the process. Typically, required documents include proof of residence, electricity connection details, and ownership papers for the property where the system will be installed. Consulting with the local installer early in the planning phase helps ensure all paperwork aligns with the latest guidelines for the central government subsidy.

Get a quote from BIKANER SOLAR

BIKANER SOLAR hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Bikaner.

Rooftop solar in Bikaner, Rajasthan

A standard residential rooftop solar system in Bikaner sizes between 1 kW and 5 kW depending on monthly consumption. Most Bikaner homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. BIKANER SOLAR can quote your specific roof; use the Get Quote form above or call 077378 60472.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Bikaner?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Bikaner?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does BIKANER SOLAR handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with BIKANER SOLAR when you call (077378 60472) or fill the Get Quote form above.

What panels and inverters does BIKANER SOLAR typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bikaner.

Location

Near, Ambedkar Cir, Shardul Colony, Bikaner, Rajasthan 334003, India

View on Google Maps →

Opening hours

Sunday09:00 – 19:00
Monday09:30 – 19:00
Tuesday09:30 – 19:00
Wednesday09:30 – 19:00
Thursday09:30 – 19:00
Friday09:30 – 19:00
Saturday09:00 – 19:00
Chat with us