Green Revolution solar energy(solar system installation and service provider

Rooftop solar installer in Patna, Bihar. ★ 5.0 (30 Google reviews) Updated June 2026.

About

Buyers considering rooftop solar installations in the Patna area will find local support for the PM-Surya Ghar subsidy process. To initiate the subsidy paperwork, applicants generally need to confirm eligibility and gather necessary documentation beforehand. It is advisable to verify the current application window, as subsidy schemes often have specific filing periods. Bringing required documents, such as proof of residence and property ownership details, to the site can help streamline the initial application submission.

Get a quote from Green Revolution solar energy(solar system installation and service provider

Submit your name + phone to reveal Green Revolution solar energy(solar system installation and service provider's contact and notify them. No spam, no obligation.

Rooftop solar in Patna, Bihar

A standard residential rooftop solar system in Patna sizes between 1 kW and 5 kW depending on monthly consumption. Most Patna homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Green Revolution solar energy(solar system installation and service provider can quote your specific roof; use the Get Quote form above or call 062002 26876.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Patna?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Bihar residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Patna?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Bihar is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Green Revolution solar energy(solar system installation and service provider handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Green Revolution solar energy(solar system installation and service provider when you call (062002 26876) or fill the Get Quote form above.

What panels and inverters does Green Revolution solar energy(solar system installation and service provider typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Patna.

Location

Gurkimandi, Gulzarbagh, Muhammadpur, Patna, Bihar 800007, India

View on Google Maps →

Opening hours

Sunday13:00 – 17:00
Monday09:30 – 17:00
Tuesday09:30 – 17:00
Wednesday09:30 – 17:00
Thursday09:30 – 17:00
Friday09:30 – 17:00
Saturday09:30 – 17:00
Chat with us