SRISHTI SOLAR ENERGY

Rooftop solar installer in Patna, Bihar. ★ 5.0 (46 Google reviews) Updated June 2026.

About

Individuals seeking reliable, localized solar energy solutions often visit this facility. The expertise available here supports residential and small commercial installations across the Patna area. When assessing the return on investment, local electricity tariffs are a primary factor in determining the payback period. Calculations for solar adoption must account for the current rate structure provided by the local utility provider. Understanding the specific tariff slabs helps determine how quickly the generated savings offset the initial system cost. Furthermore, the payback timeline is influenced by the system's efficiency relative to the average daily consumption patterns in the region. A detailed assessment comparing projected energy generation against the prevailing cost of grid electricity provides a practical measure of the long-term financial viability of the installation.

Get a quote from SRISHTI SOLAR ENERGY

SRISHTI SOLAR ENERGY hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Patna.

Rooftop solar in Patna, Bihar

A standard residential rooftop solar system in Patna sizes between 1 kW and 5 kW depending on monthly consumption. Most Patna homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SRISHTI SOLAR ENERGY can quote your specific roof; use the Get Quote form above or call directly.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Patna?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Bihar residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Patna?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Bihar is 3.5 – 5 years; the panels carry a 25-year warranty.

Does SRISHTI SOLAR ENERGY handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SRISHTI SOLAR ENERGY when you call (see contact details) or fill the Get Quote form above.

What panels and inverters does SRISHTI SOLAR ENERGY typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Patna.

Location

Near Mannat Enclave ,Kailash Nagar Bhupatipur Road, Mithapur Rd, Sipara, Patna, Bihar 800030, India

View on Google Maps →

Opening hours

Sunday09:00 – 19:00
Monday09:00 – 19:00
Tuesday09:00 – 19:00
Wednesday09:00 – 19:00
Thursday09:00 – 19:00
Friday09:00 – 19:00
Saturday09:00 – 19:00
Chat with us