About
Rooftop solar installations require careful component selection to ensure long-term energy generation. For homeowners and businesses in the Patna area, selecting panels from established, Tier-1 manufacturers is a key consideration for system longevity. When evaluating solar equipment, attention should be paid to the warranty structure, particularly the performance guarantees offered by the panel producers. Many reputable brands provide comprehensive warranties, sometimes extending up to 25 years, which covers the panel's expected efficiency output over time. Buyers should verify that the warranty terms cover degradation rates and not just the physical product for a limited period. Furthermore, understanding the inverter technology used alongside the panels is equally important, as the inverter manages the power flow and dictates the system's overall reliability.
Get a quote from Ragven Solar Pvt. Ltd.
Submit your name + phone to reveal Ragven Solar Pvt. Ltd.'s contact and notify them. No spam, no obligation.
Rooftop solar in Patna, Bihar
A standard residential rooftop solar system in Patna sizes between 1 kW and 5 kW depending on monthly consumption. Most Patna homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Ragven Solar Pvt. Ltd. can quote your specific roof; use the Get Quote form above or call 062870 68242.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Patna?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Bihar residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Patna?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Bihar is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Ragven Solar Pvt. Ltd. handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Ragven Solar Pvt. Ltd. when you call (062870 68242) or fill the Get Quote form above.
What panels and inverters does Ragven Solar Pvt. Ltd. typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Patna.
Location
Patel Colony, Road no. 1 Near Shanichra Mandir Sandalpur Road, Mahendru, Khawaza Garib Nawaj Block, P.O, Sardar Patel Colony, Patna, Bihar 800006, India
View on Google Maps →Opening hours
| Sunday | 09:00 – 19:00 |
|---|---|
| Monday | 09:00 – 19:00 |
| Tuesday | 09:00 – 19:00 |
| Wednesday | 09:00 – 19:00 |
| Thursday | 09:00 – 19:00 |
| Friday | 09:00 – 19:00 |
| Saturday | 09:00 – 19:00 |
