Gridwise Solar | Best Solar Installation Company

Rooftop solar installer in Faridabad, Haryana. ★ 5.0 (19 Google reviews) Updated June 2026.

About

Solar photovoltaic systems rely on the quality of the installed panels for long-term performance. Customers considering rooftop solar installations in the Faridabad area should prioritize panel sourcing from recognized Tier-1 manufacturers. When evaluating equipment, verifying the warranty terms is a key step; many reputable brands offer comprehensive product warranties extending up to 25 years. Beyond the stated warranty period, potential buyers should also confirm the panel's efficiency rating and its resistance to local environmental stressors. These practical checks help ensure the system selected is appropriate for the specific roof structure and regional climate. Individuals or property owners seeking reliable, long-term energy solutions can utilize this service provider for system design and installation.

Get a quote from Gridwise Solar | Best Solar Installation Company

Submit your name + phone to reveal Gridwise Solar | Best Solar Installation Company's contact and notify them. No spam, no obligation.

Rooftop solar in Faridabad, Haryana

A standard residential rooftop solar system in Faridabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Faridabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Gridwise Solar | Best Solar Installation Company can quote your specific roof; use the Get Quote form above or call 078348 46910.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Faridabad?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Faridabad?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Gridwise Solar | Best Solar Installation Company handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Gridwise Solar | Best Solar Installation Company when you call (078348 46910) or fill the Get Quote form above.

What panels and inverters does Gridwise Solar | Best Solar Installation Company typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Faridabad.

Location

Sector 2 Rd, union bank, Ballabhgarh, Faridabad, Haryana 121004, India

View on Google Maps →

Opening hours

Sunday09:00 – 18:00
Monday09:00 – 18:00
Tuesday09:00 – 18:00
Wednesday09:00 – 18:00
Thursday09:00 – 18:00
Friday09:00 – 18:00
Saturday09:00 – 18:00
Chat with us